Electric Cargo & Passenger Tricycles, Chinese EV Parts and EV Chargers — Built for Export
Configured for the roads of Lagos
Jolmolangma builds electric three-wheelers for the roads they will actually drive on: overloaded market streets, steep hills, long rainy seasons and power grids that fail every afternoon. We supply the vehicle, the batteries, the chargers and the spare parts that keep a fleet earning — with specifications we publish honestly and a payment process you can verify before you send a single dollar.
- Range and hill-climb figures published with their test conditions, never a bare headline number
- Vehicle, battery and charger quoted as separate lines, so you see the true cost of lead-acid vs LiFePO4
- 9,800+ Chinese EV parts SKUs in stock in our 4,800 m² Xuzhou warehouse — genuine OEM, approved aftermarket and inspected dismantled grades
- Start with 1–5 sample units, tour the factory by live video, send your own inspector
What is Jolmolangma?
Jolmolangma® Locomotive is a Chinese manufacturer and exporter of electric cargo tricycles, electric passenger tricycles (tuk-tuks and e-rickshaws), Chinese new energy vehicle (NEV) parts and EV chargers from 3.5 kW to 360 kW. Based in Xuzhou, Jiangsu, the company has exported since 2013 and serves customers in 63+ countries across Africa, Asia, Latin America, the Middle East and Europe.
- Products: electric cargo tricycles (300 kg to 2 t), electric tuk-tuks and e-rickshaws, Chinese EV parts across 9 systems and 37 subsystems, AC/DC/GB/T EV chargers.
- Minimum order: 1–5 sample units; full containers in CBU, SKD or CKD packing.
- Payment: T/T to one company account; balance after inspection, before shipment.
- Verification: live video factory tour and third-party inspection (SGS, BV, Intertek or your own inspector) welcome.
- Factory: No. 628, Zhengji Industrial Zone, Tongshan District, Xuzhou, Jiangsu 221200, China.
The 8 questions overseas buyers ask us most
Before we talk about products, here is what importers, fleet managers and drivers usually worry about when buying electric vehicles from China — and what we do about each problem.
Why do electric tricycle batteries die after one year?
Most early battery failures come from four causes: deep discharge, heat, overloading and a charger that does not match the battery. In daily commercial use a lead-acid pack typically lasts 12–18 months, while a LiFePO4 lithium pack usually lasts 3–5 years. We match battery, BMS and charger at the factory and quote both chemistries so you can compare the 3-year cost.
Battery options & real lifespanIs the advertised range real?
A range figure means nothing without its conditions. Range falls with load, speed, gradient, headwind and temperature, often by 30–50% between an empty test and a loaded working day. Every range we publish states the test load, average speed, route and temperature, and you can ask for the test sheet of any model before ordering.
How we test rangeWill it climb hills fully loaded?
Hill performance depends on torque at the wheel, not the motor wattage on the brochure. For hilly routes choose a model with a geared differential rear axle, a controller sized for the motor and hydraulic brakes for the way down. We publish the loaded climbing gradient measured on our own test slope for each heavy-duty model.
Heavy-duty & hill modelsCan I get spare parts after I buy?
Yes. Every vehicle comes with a spare parts list and exploded diagrams with part numbers, so parts can be identified from a number or a photo, and urgent items ship by air or express. With every vehicle order we recommend a first-year parts kit sized to your fleet, so vehicles are not parked for weeks waiting for a controller or a brake shoe.
Our spare parts guaranteeHow do I know you are a real factory?
Ask for a live video tour of the production line, check our business licence and export registration, and send your own inspector before paying the balance. Our company name, factory address, official email domain and single bank account are published on one verification page, so anyone contacting you in our name can be checked.
Verify JolmolangmaWhat about rain, heat and unstable power?
Vehicles for tropical markets get sealed connectors, raised controller mounting and a water spray test. For hot climates we manage battery temperature and recommend LiFePO4. For unstable grids we supply wide-input chargers with surge protection, or solar charging, so voltage spikes do not destroy chargers and on-board electronics.
Choose the right configurationHow much does it cost to import, and what about duty?
Landed cost is the ex-works price plus packing, inland freight, ocean freight, insurance, import duty, VAT, clearance and local delivery. Duty on fully built vehicles is often higher than on SKD or CKD kits, and SKD/CKD packing also fits more units per container. We quote every line separately and confirm loading quantities for your model.
Import cost step by stepDo your chargers work with my cars and my software?
Our chargers range from 3.5 kW to 360 kW and are built to IEC 61851 and IEC 62196. Tell us the vehicles (CCS2, Type 2, GB/T or CHAdeMO), your grid supply (single or three phase) and your back-office platform, and we confirm connector, power and OCPP compatibility before you order.
EV charger rangeWhich Jolmolangma product line fits your business?
Three questions point you to the right product centre.
Electric vehicles that work — five product centres, one factory
Jolmolangma® Locomotive is a manufacturer and exporter in Xuzhou, Jiangsu, China, founded in 2013. It builds electric cargo tricycles, electric tuk-tuks and electric cargo bikes, and supplies Chinese EV spare parts and EV chargers to customers in 63+ countries.
Four product lines — one supplier for the whole fleet
Buying vehicles from one factory, batteries from another, chargers from a third and parts from whoever answers first is how fleets end up parked. We supply all four from Xuzhou, tested together and shipped together.
Electric Cargo Tricycles
From light 300 kg delivery trikes for city markets to heavy-duty 1–2 ton models with geared rear axles for building materials and farm produce. Every model can be ordered with lead-acid or LiFePO4 batteries, open or closed cargo bodies, and a half or full cabin for rainy and hot climates.
- Load classes: 300–500 kg light · 500–800 kg standard · 1–2 t heavy-duty
- Bodies: open flatbed, closed box, refrigerated, hydraulic tipper, garbage collection, food vending
- Built for: overloading, rough roads, steep ramps, long rainy seasons
Electric Tuk-Tuks & Passenger Tricycles
Electric tuk-tuks that replace petrol three-wheelers in taxi service, e-rickshaws for short urban trips, EEC-oriented tourist tuk-tuks for European cities, and 6–8 seat shuttles for resorts and campuses. Drivers care about daily income, so we design for one full shift on one charge and fast battery swapping where fleets need it.
- Types: taxi tuk-tuk, e-rickshaw, EEC tourist tuk-tuk, 6–8 seat shuttle
- Options: left- or right-hand drive, closed cabin with doors, custom colours, seats and canopies
- For: transport operators, driver cooperatives, tour companies, hotels

Chinese EV Parts
Parts for Chinese electric cars, SUVs and vans across 9 systems and 37 subsystems — maintenance, collision, chassis, electrical and three-electric (battery, motor, controller) — in genuine OEM, approved aftermarket and inspected dismantled grades, clearly labelled, with 9,800+ SKUs in stock in Xuzhou.
- Systems: battery & BMS, e-drive, OBC & DC-DC, thermal, body & lighting
- Chinese EV parts for: BYD, Geely, Chery, Changan, MG, GWM/ORA and more
- Match by: VIN, part number or photo

EV Chargers from 3.5 kW to 360 kW
Portable chargers and home wallboxes, commercial AC pedestals, DC fast chargers for fleets and public sites, GB/T chargers for Chinese-made EVs abroad, and multi-bay low-voltage charging for tricycle fleets. Built to IEC 61851 and IEC 62196, with OCPP for operators who need remote management.
- AC: portable, 7 / 11 / 22 kW wallbox
- DC: 30–360 kW (CCS2, CHAdeMO), GB/T for Chinese EVs
- Fleets: tricycle charging & battery swap, solar + storage
Build your first enquiry across product lines
Enter quantities; the bars show your mix and the button sends it on WhatsApp.

Electric three-wheeler configurations at a glance
Use this table to shortlist a vehicle class before you ask for a quote. Figures are typical configuration ranges for each class; the exact specifications, test data and prices of each Jolmolangma model are on its own model page and in your quotation.
In short: light cargo tricycles carry about 300–500 kg on 48–60 V systems, standard models 500–800 kg on 60–72 V, and heavy-duty models 1–2 tonnes with 3–5 kW motors and geared differential axles. Passenger tuk-tuks typically seat 3–6 people on 60–72 V lithium systems.
| Class | Typical rated load / seats | System voltage | Motor power | Battery options | Typical real daily range* | Best for |
|---|---|---|---|---|---|---|
| Light cargo | 300–500 kg | 48–60 V | 0.8–1.2 kW | Lead-acid / LiFePO4 | 50–80 km | Market vendors, small shops, flat towns |
| Standard cargo | 500–800 kg | 60–72 V | 1.5–2.2 kW | Lead-acid / LiFePO4 | 60–100 km | Delivery rounds, groceries, parcels |
| Heavy-duty cargo | 1–2 t | 72 V | 3–5 kW, geared axle | LiFePO4 recommended | 60–100 km | Building materials, farm produce, hills |
| Special bodies | Varies | 60–72 V | 1.5–4 kW | LiFePO4 (+ cooling battery) | Depends on body | Cold chain, tipper, garbage, vending |
| E-rickshaw | 4 + 1 seats | 48–60 V | 1–1.5 kW | Lead-acid / LiFePO4 | 60–90 km | Short urban trips, low speed |
| Electric tuk-tuk | 3–6 seats | 60–72 V | 2–4 kW | LiFePO4 | 80–120 km | Taxi, ride-hailing, cooperatives |
| Tourist tuk-tuk | 4–6 seats | 72 V | 3–5 kW | LiFePO4 | 80–120 km | City tours, historic centres, hills |
| Shuttle | 6–8 seats | 72 V | 3–5 kW | LiFePO4 | 70–110 km | Resorts, campuses, industrial parks |
*Real daily range with a typical working load, mixed urban roads and moderate temperature. Heavy loads, steep hills, high speed and heat reduce range. Model pages state the exact test conditions.
Which configuration for my load and distance?
Payload class, motor, voltage and battery from your heaviest load and daily distance.
What will your vehicle do every day?
Buyers do not search for model numbers; they search for a job to be done. Choose yours — each page explains the load, battery and configuration that suits the work, and what does not.
Which body fits my goods?
Choose what you carry and how you unload; the preview switches to the recommended body.
Find the right vehicle in 4 questions
Answer four quick questions about your work. The finder suggests a vehicle class, battery and key options, then lets you send the result to our engineers for a matched quotation.
- Takes about 30 seconds
- Based on the same rules our engineers use
- No email needed to see the result
How to choose an electric cargo tricycle: 7 steps
To choose an electric cargo tricycle, start from the job, not the price: define your real daily load and distance, check the hills on your route, pick the battery chemistry by total 3-year cost, match the body to the cargo, confirm brakes and axle for the load, check parts availability in your country, and verify the supplier before you pay.
- Measure the real load. Use your heaviest normal trip, not your average — and add 20% margin. Overloading is the first cause of cracked frames and broken axles.
- Measure the real distance. Daily kilometres plus a 25% reserve for detours, traffic and battery ageing.
- Check the steepest hill. Above roughly 10% gradient with a full load, choose a geared differential rear axle and hydraulic brakes.
- Choose the battery by 3-year cost. Lead-acid is cheaper on day one; LiFePO4 is usually cheaper by year three for vehicles that work every day.
- Match the body to the cargo. Open body for bulk goods, closed box for parcels and rain, insulated or refrigerated for food and medicine.
- Plan for spare parts. Order a first-year kit with the vehicles; confirm how fast the supplier ships controllers, chargers and brake parts.
- Verify the supplier. Video factory tour, company documents, one bank account, and an inspection before the balance payment.
Lead-acid vs LiFePO4 for electric tricycles
For a tricycle that works every day, LiFePO4 lithium usually costs more to buy but less to own: it lasts roughly 3–4 times as many cycles, weighs about half as much and keeps its range in hot weather better than lead-acid.
| Factor | Lead-acid | LiFePO4 lithium |
|---|---|---|
| Typical cycle life* | 300–500 cycles | 1,500–2,500+ cycles |
| Typical life in daily use* | 12–18 months | 3–5 years |
| Weight for same energy | Heavier (≈2×) | Lighter |
| Charging time | 8–10 h typical | 4–6 h typical |
| Heat tolerance | Ages fast above 35 °C | Better, with BMS protection |
| Purchase price | Lower | Higher |
| Best for | Light, occasional use, tight budgets | Fleets, taxis, daily commercial work |
*Typical industry ranges at 80% depth of discharge. Actual life depends on heat, charging habits and load. Model-specific test data is available on request.
CBU vs SKD vs CKD: which way to ship?
| Shipping form | What arrives | Units per container | Best for |
|---|---|---|---|
| CBU | Fully built vehicles | Lowest | First orders, small dealers |
| SKD | Major assemblies, final assembly locally | Higher | Dealers with a workshop |
| CKD | Parts and sub-assemblies | Highest | Local assembly plants, lower duty markets |
Exact loading numbers depend on the model; we confirm them in every quotation. Container loading calculator
Compare two supplier quotations
Score each offer from 1 (poor) to 5 (excellent): left column offer A, right column offer B.
4 formulas every electric vehicle buyer should know
You do not need to be an engineer to check whether a supplier’s numbers make sense. These four formulas are the ones our engineers use every day. Each comes with a worked example you can repeat with your own figures.
1. How much power does a hill need?
m = total mass (vehicle + load, kg) · g = 9.81 m/s² · v = speed (m/s) · θ = slope angle · Crr = rolling resistance (≈ 0.015–0.02 on paved roads) · η = drivetrain efficiency (≈ 0.8).
2. How big a battery do I need?
Usable depth of discharge is about 0.9 for LiFePO4 and about 0.5 for lead-acid if you want it to last. A loaded three-wheeler typically uses 50–110 Wh per km depending on weight, hills and speed.
3. How long will charging take?
Charger efficiency is typically 0.88–0.95. For lithium batteries the last 10–20% charges more slowly, so real time is a little longer than the formula for a full charge.
4. What does a vehicle really cost me?
The total cost of ownership (TCO) is the number that decides whether electric pays. Comparing only purchase prices hides the two biggest costs of a working vehicle: fuel and batteries.
Battery and unit converter
Volts × amp-hours, range at your consumption, and the units your market uses.
Electric vs petrol tuk-tuk: how to calculate your savings
An electric tuk-tuk saves money when its daily energy cost plus battery replacement cost is lower than the petrol and engine maintenance cost of the vehicle it replaces. For most drivers covering 80–120 km a day, the savings come mainly from fuel and from far fewer moving parts to service.
| Illustrative example (your numbers will differ) | Petrol tuk-tuk | Electric tuk-tuk (LiFePO4) |
|---|---|---|
| Daily distance | 100 km | 100 km |
| Energy used | ≈ 4 L petrol | ≈ 8 kWh electricity |
| Assumed price | USD 1.00 / L | USD 0.15 / kWh |
| Energy cost per day | ≈ USD 4.00 | ≈ USD 1.20 |
| Oil, filters, clutch, engine repairs | Regular | None (motor has no oil or clutch) |
| Battery provision | — | Set aside a monthly amount for eventual replacement |
Assumptions are for illustration only; fuel use, electricity tariffs and prices vary widely by country. Put in your own numbers with our TCO & payback calculator.
Energy cost per 100 km: electric or petrol?
A 10-second check before the full calculators below.
Calculate before you buy: 6 tools our engineers use
Put in your own numbers. Every result can be sent to our engineers with one click, and we will reply with a matched configuration and quotation.
Electric vs petrol three-wheeler: 5-year cost
Default values are illustrative only. Replace them with your local prices and our quotation figures.
Landed cost per vehicle in your country
Duty and VAT rates depend on your country, HS code and whether you import CBU, SKD or CKD. Check with your customs broker; we provide HS codes and documents.
Battery size & range estimator
Estimate based on typical consumption of about 0.065 Wh per km per kg of total mass on flat roads. Use it for shortlisting; model test data is in our quotation.
Hill-climb power calculator
Physics estimate of the power needed at steady speed, excluding air drag (small below 25 km/h).
Charger sizing for a fleet or site
For tricycle fleets use the on-board or off-board charger power (typically 1–3 kW). For cars use the AC or DC power the vehicle can accept.
Solar charging system estimator
Peak sun hours: roughly 4–6 in most of Africa, South Asia and Latin America. Check local solar data for your site.
All calculators give estimates for planning. Your quotation states the exact figures for the model you choose. More calculators in our resource centre
Why LiFePO4 usually wins for vehicles that work every day
A battery is considered worn out when it can store only about 80% of its original capacity. Typical lead-acid traction batteries reach that point after roughly 300–500 full cycles; typical LiFePO4 packs after roughly 1,500–2,500 cycles. A tricycle that works six days a week uses about 300 cycles a year.
That is the whole story in one number: 300 cycles a year. A lead-acid pack can be finished within its first or second year of commercial work, while a good LiFePO4 pack can last the working life of the vehicle. Heat makes the gap larger, because lead-acid ages much faster above 35 °C. This is why we recommend lithium for taxis, delivery fleets and any vehicle used daily in hot climates, and why we still offer lead-acid for light, occasional use where purchase price matters most.
- Ask every supplier for the cycle life and the depth of discharge it was measured at
- Ask which cell maker is used and whether the BMS balances cells
- Ask whether the charger is matched to the battery chemistry
Illustrative curves based on typical industry ranges at about 80% depth of discharge and 25 °C. Real results depend on cell quality, temperature, charging and load.
Lead-acid or LiFePO4 over the years
Battery purchases by cycle life over the life of the vehicle.
Relative scores from 1 (weak) to 5 (strong), based on typical characteristics of each chemistry. “Purchase price” scores higher when cheaper.
Lead-acid vs LiFePO4 across six factors that matter to operators
LiFePO4 outperforms lead-acid on cycle life, weight, charging speed, heat tolerance and usable capacity; lead-acid wins only on purchase price. For vehicles that work every day, the five lithium advantages usually outweigh the one lead-acid advantage within the first two to three years.
- Cycle life — the single biggest factor in total cost
- Usable capacity — lead-acid should not be discharged below about 50%
- Weight — every kg of battery is a kg of cargo you cannot carry
- Charging speed — shorter charging means more working hours
- Heat tolerance — critical in Africa, the Middle East and South Asia
5 more formulas for range, speed, battery packs, CO₂ and charger wiring
These formulas power the professional tools below. Each is shown with its variables and a worked example, so you can check any supplier’s figures yourself.
5. Real range
6. Top speed from gearing
7. Building a LiFePO4 pack
8. CO₂ saved
9. Charger current and breaker

9 more tools for importers, fleet managers and installers
From range and gearing to container loading, Incoterms and charger wiring — the practical questions that decide whether a project works. Every result can be sent to our engineers with one click.
Real-world range estimator
Planning estimate using typical consumption per kg plus a speed factor. Model test data is in our quotation.
Bars: estimated range at different loads (current load highlighted)
Top speed & wheel torque from gearing
Tyre diameters are approximate. A two-speed axle gives two results — try both ratios.
LiFePO4 battery pack builder
LiFePO4 nominal cell voltage 3.2 V. Pack weight adds BMS, busbars and casing (about +15–25%).
Container loading by crate size
Geometric estimate from the crate dimensions in our packing list (floor fit in both orientations, height-limited stacking, payload check). Final loading plans are confirmed by our logistics team.
CO₂ savings for your fleet
Petrol combustion ≈ 2.31 kg CO₂ per litre. Use your national grid factor; enter 0 for solar-charged fleets. Useful for ESG and NGO reporting.
Energy cost per km & efficiency converter
Works in any currency. 1 L of petrol contains about 8.9 kWh of energy — the equivalence shows how much more efficient an electric drivetrain is.
Tuk-tuk driver daily income
Any currency. Compare with the same inputs for a petrol tuk-tuk to see the difference in take-home income.
EV charger current, breaker & voltage drop
Indicative only; cable sizing must also consider installation method, temperature and local codes. Installation must be done by a licensed electrician.
Incoterms® finder: who pays and who carries the risk?
Choose what you want to handle yourself. The finder highlights the Incoterms that match, and the table shows each party’s responsibility.
| Task | EXW | FCA | FOB | CFR | CIF | DAP | DPU | DDP |
|---|---|---|---|---|---|---|---|---|
| Export clearance | B | S | S | S | S | S | S | S |
| Loading at origin / on vessel | B | S | S | S | S | S | S | S |
| Main freight | B | B | B | S | S | S | S | S |
| Insurance | B | B | B | B | S | S* | S* | S* |
| Risk passes | Seller’s premises | Handover to carrier | On board vessel | On board vessel | On board vessel | At destination | Unloaded at destination | At destination |
| Unloading at destination | B | B | B | B | B | B | S | B |
| Import clearance, duty & VAT | B | B | B | B | B | B | B | S |
S = seller, B = buyer. *Under DAP, DPU and DDP insurance is not compulsory, but the seller carries the risk until delivery. Incoterms® is a trademark of the International Chamber of Commerce. We quote EXW, FOB, CFR, CIF, DAP and DPU on request.



What more than a decade of exporting electric three-wheelers has taught us
By the Jolmolangma engineering team · reviewed by Wanny Wong, Sales Manager
Buyers ask about range; vehicles fail from overloading, water and bad charging
Almost every first inquiry we receive asks “how many kilometres?” Yet when we analyse warranty claims, very few relate to range. The failures that actually park vehicles are cracked frames and broken axles from loads far above the rating, controllers and connectors damaged by water, and batteries killed by the wrong charger or by being run flat every day. That is why we ask about your load, your roads and your rainy season before we recommend a model — and why we will tell you when a cheaper light model is the wrong choice for your work.
The battery is the most expensive part of the vehicle’s life, not the frame
Over three years, a working tricycle on lead-acid batteries may need two or three replacement packs. Fleet owners who compare only the ex-works price often discover this in year two. We quote vehicle, battery and charger as separate lines precisely so that the battery decision is made with open eyes. For vehicles that work every day, we usually recommend LiFePO4; for light, occasional use, lead-acid can still be the sensible choice.
What customers fear is not a high price — it is a vehicle standing still
A distributor can sell a slightly more expensive vehicle. What destroys his reputation is a customer waiting six weeks for a controller. This is why every vehicle order comes with a recommended first-year parts kit, a parts list and exploded diagrams. When a dealer tells us “your parts arrived in five days”, that is worth more to our next order than any discount.
The first order is almost always a test — and it should be
Serious importers start with one to five vehicles, drive them on their own streets for a month, and then order containers. We encourage this. A supplier who insists on a full container before you have seen the product is asking you to carry all the risk. Our sample policy exists because our best long-term partners all started small.
High-duty markets move to local assembly — plan for it early
In many countries, import duty on fully built vehicles is higher than on kits, and a container of CKD parts carries far more units. Distributors who grow usually end up assembling locally. We design packing lists, jigs and assembly training for SKD and CKD from the start, so that moving from CBU to local assembly does not mean changing supplier.
Chinese EVs are selling abroad faster than their after-sales networks
Chinese electric cars are now common on roads far from China, but workshops in many of those markets still struggle to find the right part. A VIN-matched part that arrives in a week keeps a taxi on the road; a wrong part costs two weeks and a return shipment. That gap is why we built our Chinese EV parts catalogue by brand, model and system, and why we label every part as genuine, OE or aftermarket.
Honesty about limitations wins more business than exaggeration
Buyers now check what suppliers say against other websites, videos and AI assistants. A range claim that fails on the first loaded trip loses the customer and everyone he talks to. We publish test conditions, say which models are unsuitable for which jobs, and put our company details where anyone can verify them. It costs us a few inquiries from people looking for the lowest number; it earns us the customers who reorder.
What does overloading cost in bearing life?
Rolling-bearing life falls with the cube of the load (ISO 281).